The building is at the campus area of the university near Sinop Airport. The structure is composed of two parts and a unit that connects these two to each other. A garden is planned between the two buildings so as to enhance the communication with nature. This design allows different project groups to study independently. The structure has study and research laboratories, administrative units and conference hall. Single storey laboratory units are on two sides. The structure that connects these two has service units, cafeteria and main circulation unit at the ground floor and offices and the conference hall at the upper floor. It is approximately 3300 m2 and has been in service in 2011.