The area allocated for the project at the campus area is in relation with the gym, administrative buildings and students life center, also it is easy to reach for campus residents and outcomers. The project includes open-air sports areas, concert-festival areas, landscape areas, a stadium for 5000 people, jogging paths and a cafeteria. Open-air sports areas have relation with both the gym and the cafeteria building. The terrace of the cafeteria and mobile spectators units allow people to watch the sports activities held there. The area arranged for highway administration construction site before has been used as amphitheatre and stadium spectators area, thus the land has been used favourably and has been protected from outer effects.