The research center is positioned near Science and Literature Faculty and Engineering Faculty to serve their future users. Administrative units, amphitheatre, store and service units are reached from the upper level where the main settlement is located. From the middle part of this high block, the main circulation axis extends along the slope with a series of ramps. At the each side of the ramps, there are laboratories standing vertically to the road. As the corridor ceilings of the laboratories are built low, light can be taken from double directions. The system set between the main circulation and laboratory branches allows the extension of the building one level further. The structure has 3300 m2 of area of usage. It was completed in 2010.